[DataMesh Director Use Case] Toda Corporation
A case study that projected the changes in shape on-site using MR technology and verified its effectiveness for practical use!
We would like to introduce a case study of the construction simulation using BIM × MR × 5G for the new construction project of SAGA Arena, conducted in collaboration with Todan Construction Co., Ltd. To improve construction productivity at the site, we utilized "DataMesh Director" to reproduce the construction quality in MR. Based on the 3D model created during the front-loading phase, we used the same product to create an MR model reflecting the positions of walls and doors in the construction drawings. [Case Overview] ■ Product Used: DataMesh Director ■ Company Implementing: Todan Construction Co., Ltd. *For more details, please download the PDF or feel free to contact us.
- Company:DataMesh 本社
- Price:Other